ShaftCon Tanzania project, underground

Case study · Barrick · Tanzania

North Mara underground support, Tanzania

Vertical dam support and wet-crete on the 950 and 980 levels of Barrick’s North Mara underground mine — delivered by ShaftCon Engineering Limited.

The project

Securing the ground around vertical dams underground

At Barrick’s North Mara mine in northern Tanzania, ShaftCon works underground on the support of vertical dams, with wet-crete applied over the new support. The company profile records the work on two levels of the underground mine: the 980 level and the 950 level.

The profile’s photographs from both levels show the ground before support: broken sidewalls and hanging wall under the cap lamp. On surface, our team prepared the handrails for the 980 level in the workshop.

The work is carried out by ShaftCon Engineering Limited, our Tanzanian company in Dar es Salaam, led by technical director Gift Mollel. The company holds a BRELA certificate of incorporation, a TIN certificate, an OSHA compliance certificate, a business licence, a tax clearance certificate and a local content plan, all published on our safety and compliance page.

Client
Barrick
Site
North Mara underground mine, Tanzania
Work
Vertical dam support and wet-crete; handrails for the 980 level
Levels
980 level and 950 level
Contractor
ShaftCon Engineering Limited

The work

Vertical dam support

Installation of ground support at the vertical dams underground.

Wet-crete

Wet-crete applied over the installed support to seal the rock surface.

980 and 950 levels

Work recorded on two levels of the underground mine, each photographed before support.

Handrails for the 980 level

Handrail posts prepared in the workshop for the 980 level.

Local company, local team

Delivered through ShaftCon Engineering Limited, our Tanzanian company, with its own registration and local content plan.

Compliance on file

BRELA, TIN, OSHA, business licence and tax clearance certificates are available to download.

Before support

The 980 and 950 levels before the support was installed, from the company profile — and the handrail preparation on surface.

North Mara underground, 980 level, before support
980 level, before support
North Mara underground, 950 level, before support
950 level, before support
Preparing handrails for the 980 level, North Mara
Preparing handrails for the 980 level

On site in Tanzania

Photographs from the current ShaftCon website’s Tanzania project page.

Tailing dam build and maintenance